Overview
In this article you will be able to see the trend charts for the progress. The below chart is shown only when you select single category or stage, where it shows the bar graph and trend chart.
Whereas, multiple selected categories or stages only trend charts are shown.
Selecting Multiple Stages or Categories
Single Category Selection: Choose multiple stages within a single category.
Multiple Categories Selection: Choose multiple stages across different categories.
This flexibility allows users to adapt the progress view to their specific monitoring needs.
Behaviour for Multiple Selections
Bar Chart Visibility: Hidden when multiple stages are selected; only a cumulative line chart is displayed.
Percentage Display: Disabled; all line chart values are shown as percentages.
Trend Chart: Displays each selected stage or category as a separate line.
Dropdown Bar: Shows the count of selected items (e.g., "2 selected").
Reference List: Categories and stages listed below the chart for clarity.
Users can also now download PDF format report for trend charts, once you are in the trends page. Click export to PDF and the document will be downloaded.
Zone Level Temporary Schedule and Predictions:
The Zone-Level temporary Schedule and Predictions enhancements allow users to simulate schedule changes directly at the zone-stage level without immediately updating the original work schedule. This helps evaluate the impact of schedule changes on trends, required production rates, and predictions before committing those changes.
In addition, several usability improvements have been made to the Schedule Dates functionality, making it easier to manage temporary schedules and update work schedules when required.
Zone-Level Schedule
Users can now apply a schedule to a selected zone-stage combination directly from the Trends page.
A temporary schedule allows users to:
Simulate schedule changes without modifying the original work schedule. Review updated trend lines and predictions.
Compare production rates before making permanent schedule updates. Maintain a history of recently applied temporary schedules (up to three).
The Change Schedule option becomes available when:
A zone-stage combination is selected and the Scheduled Trends toggle or Predictions toggle is enabled.
If neither toggle is enabled, the option is displayed but remains disabled.
Hover message: Enable Scheduled Trends or Predictions to change schedule.
Supported Selection Types
Single zone-stage selection
Multiple zone-stage selections
Zone selections across multiple levels
Combined level-stage and zone-stage selections
Each selected zone-stage combination is managed independently.
Applying a Temporary Schedule
Navigate to the Trends page. Select one or more Zone-Stage combinations.
Enable Scheduled Trends or Predictions. Click Change Schedule.
Select temporary start and finish dates. Click Select and Click Apply Temporary Schedule.
Once applied:
Trend lines update immediately.
Predictions are recalculated.
Selected temporary dates are displayed.
Temporary schedule history is maintained.
If original schedule dates already exist, they are pre-selected automatically.
Updating the Original Work Schedule :-
Temporary schedules do not modify the original work schedule.
To permanently update Track3D: Open the Change Schedule. Review the temporary schedule. Click the Update icon. Confirm the update.
After confirmation:
The Work Schedule is updated.
Changes appear on the Work Schedule page.
Schedule logs are generated.
Logs are available for download.
Only users with Work Schedule permissions can perform permanent updates.
Temporary Schedule History : Each combination stores up to three temporary schedules. History includes:
Selected dates
Applied schedules
Updated log formatting
If no history exists, the panel displays: No history yet
Even if a task is 100% complete, users can still:
Apply temporary schedules
Review updated trend lines and View prediction changes
Switching Back to Regular Trends
If both Scheduled Trends and Predictions are turned off:
Any applied temporary schedule is automatically removed.
Trend lines return to the original schedule.
The standard Trends view is restored.
Important Notes
All existing Schedule Dates and Predictions functionality continues to apply unless explicitly changed.
Zone-level functionality follows the same behaviour as existing level-stage scheduling wherever applicable.
Exported reports now include zone-level details.
Saved Views support zone-stage combinations.
Temporary schedules affect only the current simulation until users explicitly update the original Work Schedule.
We hope this article has been helpful. If you have any questions please reach out to [email protected]